Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com. Alternatively, if you are interested in receiving a copy of an evaluation report, please contact us

Country/Region

A series of failures was the starting point for this analysis. Several outbreaks of hepatitis E, transmitted via the water supply, occurred in refugee and IDP sites in the Sahel (Sudan in 2004, and Chad in 2007) and in central Africa (Central African Republic in 2002, and Uganda in 2007). MSF was responsible for all or part of the water supply, as well as medical care. These outbreaks are a reminder that significant infectious risks persists even after we implement our usual procedures.

Jean-Hervé Bradol, Francisco Diaz, Jérôme Léglise, Marc Le Pape
08/07/2015

Internal report An Ebola outbreak was declared in Uganda on 29th of November 2007. An MSF Intervention took place between 1st of December 2007 and 18th January 2008. This report summarises, after general issues, the main points on intersection coordination, coordination with other/external actors, human resources management, expat health and project set up.

admin
09/06/2008

MSF-CH has been working in Gulu since 2003, supporting different health structures and running a shelter for “night commuters”. This evaluation was initiated by the desk, mainly because the progress of this project was slow and there were doubts whether it addresses real needs. Hence the general objective of the evaluation was to review the intervention in Gulu and determine its Relevance, Effectiveness and Efficiency. In addition Perception, Co-ordination and Exit strategies were looked at. The evaluation was carried out between September and October 2005.

admin
01/10/2005