Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

This report presents a lessons learned exercise of OCG’s ongoing intervention in Dagahaley refugee camp in Kenya. It describes the project’s main achievements and medical outcomes and examines the effect of the remote modus operandi and the adaptive measures that were taken.

This publication was produced at the request of MSF-OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Nicole Henze and Séverine Ramon.
07/08/2019

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

The objective of this lessons learnt exercise was to assess the advantages and disadvantages of the UNITAID grant governance and management model for project achievements in terms of medical (and related) outcomes, strategic decisions, the potential for collaboration between multiple MSF entities and to leverage the learnings for replication in future projects. The exercise showed that the project directly delivered a new, more effective, simpler and much cheaper treatment to patients across seven countries.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Hugues Juillerat, Sharon McClenaghan and Glenn O’Neil of TRAASS International.
15/01/2019

This evaluation was commissioned with the objective to enhance future operational performance by means of lessons learned from the intervention in Hajjah Governorate from 30 March to October 2017 in order to reduce morbidity and mortality caused by cholera outbreaks in similarly complex settings. Evaluation findings showed that the intervention contributed to reduce morbidity, mortality and human suffering, even though data collection was chaotic in the beginning.

This publication was produced at the request of MSF OCBA, under the management of the Vienna Evaluation Unit. It was prepared independently by François Grünewald and Dr Paula Farias.
26/09/2018

Optimizing HIV, TB and NCD treatment in five sub-saharan countries.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Catherine Lalonde and Joost van der Meer.
12/02/2018

Integration of HIV/TB services is one of the priorities for the MSF movement since 2010 and in particular for OCBA that started hand over of the so-called vertical programs in the same year. This process has finished for the total of 16 vertical HIV programs of MSF-OCBA started since 2005. Integration aims to provide access to HIV/TB care to all populations in need in locations where MSF has implemented regular projects, regardless of the HIV prevalence in places such as CAR (started in 2008), South Sudan (2011) and Niger (2014).

This publication was produced at the request of MSF OCBA, under the management of the Athens Evaluation Unit. It was prepared independently by Geraldine Brun and Heinz Henghuber (TL) and managed by the Athens Evaluation Referent Dimitra Kageropoulos.
10/11/2016

In recent years, MSF has recognised the need to improve its handover process and outcomes. It is no longer satisfactory for the organisation to enter a country, put in place a programme and leave without some degree of accountability for what remains after MSF’s departure. This tendency has led the MSF Operational Centre Paris (OCP) to review the handover process of the Homa Bay County Hospital project in Kenya. The main goal of this evaluation is to explore how effective the handover strategy was in contributing to sustainable, comprehensive quality of HIV/TB care in Homa Bay.

This publication was produced at the request of MSF OCP, under the management of the Vienna Evaluation Unit. It was prepared independently by Marielle Bemelmans and Annie Désilets.
18/01/2016

In recent years, MSF has recognised the need to improve its handover process and outcomes. It is no longer satisfactory for the organisation to enter a country, put in place a programme and leave without some degree of accountability for what remains after MSF’s departure. This tendency has led the MSF Operational Centre Paris (OCP) to review the handover process of the Homa Bay County Hospital project in Kenya. The main goal of this evaluation is to explore how effective the handover strategy was in contributing to sustainable, comprehensive quality of HIV/TB care in Homa Bay.

This publication was produced at the request of MSF OCP, under the management of the Vienna Evaluation Unit. It was prepared independently by Marielle Bemelmans and Annie Désilets.
18/01/2016

OCB initiated the Kibera project at a time when there was a lack of access to affordable HIV/TB health care and succeeded in providing HIV drugs in Kenya, against all odds. The initial decision to intervene in Kibera was based on need and while the needs remain massive, OCB is no longer alone in providing HIV and TB treatment, hence the opportunity to handover the responsibilities of the health facilities to the Nairobi County to ensure that the population is not abandoned and that the quality care and treatment is continued.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Eddah Kanini.
01/12/2015

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015