Photos: 

Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Topic

Country/Region

C

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

MSF OCB commissioned an extensive multi-sectoral critical review of its Ebola intervention. The summary report highlights key findings from all specific reports and draws global conclusions. Lessons have been identified both, for future large scale emergency responses as well as for a next Ebola response. Many of lessons identified are not entirely new, but their importance has been strongly accentuated by the extremity of this health crisis. Priority recommendations are listed in the summary report, while specific recommendations are made in the respective reports.

The following persons have contributed to this report: Virginie Adams, Dr Marie-Pierre Allié, Pierre Beurrier, Murray Biedler, Elio de Bonis, Prof. Robert Colebunder, David Curtis, Gillian Dacey, Veronique de Clerck, Dr Javier Gabaldon, Xavier Henry, Francois Mounis and Veronica Sanchez.
26/04/2016

This evaluation has been triggered by the recent finding that a substantial proportion of the Changara project’s patients had a high VL of more than 3,000 copies/ml (the criteria at the time), raising questions on the efficacy of the counselling services. Although the relationship between counselling and high VL remains unclear, this report details three key recommendations aimed at improving the overall efficacy of the counselling services.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Mranda Brouwer of PHTB Consult. This publication was produced at the request of Médécins sans Frontières. It was prepared independently by Miranda Brouwer of PHTB Consult.
21/04/2016

During the 2014-2015 Ebola virus disease outbreak in West Africa, MSF built a number of Ebola Treatment Centres (ETCs). MSF set up centres in the three countries at different moments and with different MSF Operational Sections, which resulted in a heterogenic collection of solutions. This review was conducted jointly for all MSF operational centers (OCs). It was commissioned by OCA and was conducted as part of the OCB Ebola review. 

This publication was produced at the request of MSF OCA coordinated within a broader review on OCB's response to the Ebola emergency, under the management of the Stockholm Evaluation Unit. It was prepared independently by Veronica Sanchez Carrera.
01/12/2015

This operational evaluation, requested by the Emergency Department of MSFOCB, concerns only the emergency response in Aceh in the first three months (from 26th Dec 2004). The report illustrates MSF intervention strategy, a description of implemented activities and draws lessons learned from the confronted challenges.

01/11/2005

L'évaluation fait partie de l'accord de financement avec le bailleur. En outre, étant donnés les changements que le projet a vécu récemment, le moment est opportun pour évaluer les stratégies mises en place afin de fournir de nouvelles recommandations pour la mise en œuvre du projet en Guinée. L'évaluation englobe aussi le renforcement des structures de santé périphériques.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Miranda Brouwer of PHTB Consult.
21/04/2016

In September 2009, MSF carried out an assessment of two of its former projects in Karuzi (OCB) and Kinyinya (OCA), Burundi. These two projects were handed over to MOH in 2007 with significant investment from MSF in the handover processes. Following reports of the breakdown of healthcare after MSF’s departure and criticism on the way the handover of these two projects was managed, MSF wanted to assess the current situation in the two sites and document which, if any, handover strategies were successful and led to the continuation of MSF activities.

Frédérique Ponsar and Annie Désilets
27/11/2009

Following the handover of AIDS treatment programs to the authorities of Guatemala, MSF conducted a study to assess various aspects of the continuity of HIV/AIDS care. This review was conducted 18 months after MSF left the Roosevelt hospital, and examined both the clinical data and opinions of staff and patients. Despite some shortfalls in the frequency of laboratory testing and community follow up, the level of care and outcomes for the patients was well maintained by the hospital staff.

01/08/2007

Towards the end of 2006/ early 2007, MSF-OCB opened a primary health care project in Chhattisgarh, India, part of the Red Corridor within which a low-intensity conflict is taking place between Maoists and Government. The situation remains volatile with potential for the project to remain operational for some years. Within this context, and given no history of previous evaluations, a decision was taken to assess the relevance and impact of the project, as well as the appropriateness of operational strategies in relation to these, including the potential for phase out.

Iesha Singh, Anneli Eriksson and Alexandra Papis
25/01/2011

Pages