Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

This document describes the Lessons identified during the emergency phase of the MSF Sweden (MSFSE) response to the November 2013 Philippines Disaster. It summarises the successes and challenges encountered during the process, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning themes.

Full Report

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
12/07/2019

The MSF Sweden Innovation Unit (SIU) aims to promote innovations that help save lives and alleviate suffering, and to develop a culture of innovation within MSF. Since its initial creation in 2012, the SIU has gone  through a rapid period of development. It has been transformed from a project into a separate unit with activities having become more structured and professional, and the number of innovation initiatives and projects increasing along with the unit size.

This publication was produced at the request of the Sweden Innovation Unit, MSF Sweden, under the management of the Vienna Evaluation Unit. It was prepared independently by Patrick Robitaille and Chris Houston.
09/05/2019

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

The objective of this lessons learnt exercise was to assess the advantages and disadvantages of the UNITAID grant governance and management model for project achievements in terms of medical (and related) outcomes, strategic decisions, the potential for collaboration between multiple MSF entities and to leverage the learnings for replication in future projects. The exercise showed that the project directly delivered a new, more effective, simpler and much cheaper treatment to patients across seven countries.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Hugues Juillerat, Sharon McClenaghan and Glenn O’Neil of TRAASS International.
15/01/2019

This evaluation was commissioned with the objective to enhance future operational performance by means of lessons learned from the intervention in Hajjah Governorate from 30 March to October 2017 in order to reduce morbidity and mortality caused by cholera outbreaks in similarly complex settings. Evaluation findings showed that the intervention contributed to reduce morbidity, mortality and human suffering, even though data collection was chaotic in the beginning.

This publication was produced at the request of MSF OCBA, under the management of the Vienna Evaluation Unit. It was prepared independently by François Grünewald and Dr Paula Farias.
26/09/2018

Integration of HIV/TB services is one of the priorities for the MSF movement since 2010 and in particular for OCBA that started hand over of the so-called vertical programs in the same year. This process has finished for the total of 16 vertical HIV programs of MSF-OCBA started since 2005. Integration aims to provide access to HIV/TB care to all populations in need in locations where MSF has implemented regular projects, regardless of the HIV prevalence in places such as CAR (started in 2008), South Sudan (2011) and Niger (2014).

This publication was produced at the request of MSF OCBA, under the management of the Athens Evaluation Unit. It was prepared independently by Geraldine Brun and Heinz Henghuber (TL) and managed by the Athens Evaluation Referent Dimitra Kageropoulos.
10/11/2016

This report is a review of advocacy within the MSF movement from 2010-2015. Commissioned by the core ExCom, the aim of this review was to explore the effectiveness of MSF advocacy and produce recommendations to improve its approach, coordination and organization in support to operations within the movement. Two external evaluation consultants, Glenn O’Neil and Liesbeth Schockaert, conducted the review with the support of Nirupama Sarma who carried out a complementary review of the Access Campaign (AC).

This publication was produced at the request of MSF International, under the management of the Vienna Evaluation Unit. It was prepared independently by Glenn O'Neil and Liesbeth Schockaert, with contributions from Nirupama Sarma.
14/09/2016

Family and Sexual Violence in PNG is pervasive and widespread, centered within the family and the extended family (wantok), and manifests itself as physical or emotional abuse, sexual abuse, and social isolation. There is also a stigma attached to young survivors making it difficult to report. The endemic nature and high rates of violence within the family impact women and children the most in PNG.    

This publication was produced at the request and under the management of MSF OCA, with support from the Stockholm Evaluation Unit. It was prepared independently by Tania Bernath.
30/05/2016

An external evaluation of the support programs has been conducted between April and June 2015. This 360° snapshot was aiming at evaluating the appropriateness, the effectiveness and the impact of the support activities operated from Turkey and Lebanon.

Stockholm Evaluation Unit. Ofelia Garcia (lead evaluator)
30/07/2015

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015