Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

C

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

2005 was marked by two major natural calamities, the tsunami waves in South East Asia and the earthquake in Kashmir, Pakistan. Both of them were followed by a large intervention of MSF. After the initial assessment, MSF Belgium concentrated his efforts on the district of Bagh. The report will focus on the first 3 months of the intervention. As only a few documents are available, it was requested to reconstitute a chronology of intervention. Secondly, when there was time available, a short description and appreciation of the interventions of the other MSF sections was asked.

William Claus
01/04/2006

After an initial period of three years in Lesotho, MSF has decided to extend its presence in the country for two more years and to launch a second phase of the project primarily focused on intensifying the transfer of responsibility for the programme to local health authorities and partners. This is due partly to the administrative process now underway in Lesotho to decentralise to local government, coupled with related health sector reforms, which have divided the former catchment area of Scott Hospital Health Service Area into two districts with different management structures.

Guillaume Jouquet
01/07/2009

Following the handover of AIDS treatment programs to the authorities of Guatemala, MSF conducted a study to assess various aspects of the continuity of HIV/AIDS care. This review was conducted 18 months after MSF left the Roosevelt hospital, and examined both the clinical data and opinions of staff and patients. Despite some shortfalls in the frequency of laboratory testing and community follow up, the level of care and outcomes for the patients was well maintained by the hospital staff.

01/08/2007

In recent years, MSF has recognized the need to improve its handover process and outcomes. It is no longer satisfactory for the organization to enter a country, put in place a program and leave without taking some accountability for what remains after MSF’s departure. It is in this spirit that I accepted to come to Lesotho to evaluate a handover tool that was implemented here during the initial phase of the handover.

Annie Désilets
30/04/2010

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

The MSF Sweden Innovation Unit (SIU) aims to promote innovations that help save lives and alleviate suffering, and to develop a culture of innovation within MSF. Since its initial creation in 2012, the SIU has gone  through a rapid period of development. It has been transformed from a project into a separate unit with activities having become more structured and professional, and the number of innovation initiatives and projects increasing along with the unit size.

This publication was produced at the request of the Sweden Innovation Unit, MSF Sweden, under the management of the Vienna Evaluation Unit. It was prepared independently by Patrick Robitaille and Chris Houston.
09/05/2019

This document describes the Lessons identified during the emergency phase of the MSF Sweden (MSFSE) response to the November 2013 Philippines Disaster. It summarises the successes and challenges encountered during the process, lists the important learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning themes.

Full Report

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
12/07/2019

Pages