Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com. Alternatively, if you are interested in receiving a copy of an evaluation report, please contact us

En juin 2009, une évaluation finale des 3 années de projet de MSF-CH (2005 à 2008) à Dabola en Guinée a été menée afin (i) d’en documenter les stratégies et (ii) d’en faire une analyse critique en termes d’accès auxsoins, de perception, de durabilité et d’impact.

SCAVACO
23/12/2009

Executive Summary in English, main report in French The 2 objectives for MSF in Lubutu for the 5 years duration of the project are 1) to bring quality health care to the population 2) to capitalise on a model of care for MSF. This study takes place within the capitalisation objective of the project by analysing its expenses and cost. The goal of this study is also to improve the efficiency of the project.

Guillaume Jouquet
01/12/2009

In September 2009, MSF carried out an assessment of two of its former projects in Karuzi (OCB) and Kinyinya (OCA), Burundi. These two projects were handed over to MOH in 2007 with significant investment from MSF in the handover processes. Following reports of the breakdown of healthcare after MSF’s departure and criticism on the way the handover of these two projects was managed, MSF wanted to assess the current situation in the two sites and document which, if any, handover strategies were successful and led to the continuation of MSF activities.

Frédérique Ponsar and Annie Désilets
27/11/2009

In May 2007 MSF-OCA integrated the drug-resistant tuberculosis (DR-TB) treatment programme into the horizontal primary and secondary health care programme at Shabunda, located in South Kivu District of Democratic Republic of Congo (DRC). The three patients were started on the DR-TB treatment on 17th May 2007. MSF closed the project by the end of 2007, but continued taking responsibility for the treatment of the three DR-TB patients through remote supervision by providing medical, laboratory and social support.

05/10/2009

In June 2009, after three years of the project by MSF-CH (2005 to 2008) in Dabola, Guinea, a final evaluation was conducted with the objective to (i) document the project’s strategies and (ii) undertake a critical analysisof the project regarding access to health care, perception, sustainability and impact.

Dr. Sophie Odermatt-Biays
03/09/2009

After an initial period of three years in Lesotho, MSF has decided to extend its presence in the country for two more years and to launch a second phase of the project primarily focused on intensifying the transfer of responsibility for the programme to local health authorities and partners. This is due partly to the administrative process now underway in Lesotho to decentralise to local government, coupled with related health sector reforms, which have divided the former catchment area of Scott Hospital Health Service Area into two districts with different management structures.

Guillaume Jouquet
01/07/2009

 

Gunilla Kuperus and Catrin Schulte-Hillen
01/06/2009

The overall objective of the evaluation is to identify and describe factors and issues to consider when planning implementation or continuation of Remote Control Programmes (RCPs) as an alternative to cancelling Médecins Sans Frontières (MSF) programme implementation in a particular region/ country.

Martin Braaksma and Mzia Turashvili
01/06/2009

Pages