Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com. 

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

In February 2011, four MSF staff members acquired Lassa Fever in the MSF-run hospital, GRC (2 of whom died). This led OCB to propose an evaluation of the related events occurring in January-March, in order to learn lessons and possibly adjust internal procedures or processes. A qualitative evaluation was carried out through interviews and document-review.

Mzia Turashvil
09/08/2011

The HIV/AIDS project in Chamanculo Health area has achieved an impressive coverage of the ART treatment through the well-applied decentralization and task-shifting strategies. The evaluation demonstrated that the quality of the care was not compromised through this process. This decentralization model shall be valuable for the MoH to scale-up their ART treatment coverage in other areas of this resource-poor country.

Heidi Becher and Beatrice Crahay
01/04/2011

Towards the end of 2006/ early 2007, MSF-OCB opened a primary health care project in Chhattisgarh, India, part of the Red Corridor within which a low-intensity conflict is taking place between Maoists and Government. The situation remains volatile with potential for the project to remain operational for some years. Within this context, and given no history of previous evaluations, a decision was taken to assess the relevance and impact of the project, as well as the appropriateness of operational strategies in relation to these, including the potential for phase out.

Iesha Singh, Anneli Eriksson and Alexandra Papis
25/01/2011