Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com. Alternatively, if you are interested in receiving a copy of an evaluation report, please contact us

In the last few years, MSF OCG has developed an Operational Policy with the ambition to increase and improve the quantity and quality of secondary health care structures (or inpatient care). This recognition has prompted the organization to take a closer look at the challenges, lessons and accomplishments in terms of hospital management to develop strategies that will enable the organization to successfully set up, govern, implement and exit inpatient projects in all types of contexts.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Annie Désilets and Ines Hake.
28/03/2017

During the 2014-2015 Ebola virus disease outbreak in West Africa, MSF built a number of Ebola Treatment Centres (ETCs). MSF set up centres in the three countries at different moments and with different MSF Operational Sections, which resulted in a heterogenic collection of solutions. This review was conducted jointly for all MSF operational centers (OCs). It was commissioned by OCA and was conducted as part of the OCB Ebola review. 

This publication was produced at the request of MSF OCA coordinated within a broader review on OCB's response to the Ebola emergency, under the management of the Stockholm Evaluation Unit. It was prepared independently by Veronica Sanchez Carrera.
01/12/2015

OCB initiated the Kibera project at a time when there was a lack of access to affordable HIV/TB health care and succeeded in providing HIV drugs in Kenya, against all odds. The initial decision to intervene in Kibera was based on need and while the needs remain massive, OCB is no longer alone in providing HIV and TB treatment, hence the opportunity to handover the responsibilities of the health facilities to the Nairobi County to ensure that the population is not abandoned and that the quality care and treatment is continued.

This publication was produced at the request of MSF OCB, under the management of the Stockholm Evaluation Unit. It was prepared independently by Eddah Kanini.
01/12/2015

In 2010 the operational prospects for OCB (strategic operational plan) outlined the broad objectives for the coming three years and placed renewed attention on key medical areas including surgery and emergency and acute medicine, bringing about increased investment in two hospital programs where OCB focussed on providing emergency surgical care in third level facilities in Tabarre and Kunduz.

This publication was produced at the request of MSF OCB, under the management of the SEU. It was prepared independently by Juan Luis Dominguez and Jon Gunnarsson.
29/10/2015

Following the earthquake in 2010 and the emergency response that ensued, MSF-OCG took the decision to invest in a hospital in the Leogane area that was for several years the biggest hospital managed by MSF-OCG. Given that for the last three years this was the only MSF-OCG project in the country, that the capital is located only two hours from the hospital and that there is a strategic ambition within MSF-OCG to review mission set-ups, OCG and the field teams determined that 2013 was an opportune time to review the Haiti mission.

Annie Desilets
01/11/2014

The MSF-OCG handover process of the nutritional programme in Zinder was evaluated with the objective to assess best practices, challenges and lessons learnt of the handover/integration process of the Zinder CRENI to the hospital, with the main purpose to improve handover processes in such contexts as well as decision-making in future projects. The evaluation has confirmed the pertinence of MSF in Zinder since 2005 and has contributed to the reduction of the infant mortality rate.

Jonathan Novoa Cain
01/08/2014

The ambition to improve hospital care outcomes is a high priority in the MSF movement today. Over the past few years evaluations of hospital projects have been carried out by all the operational MSF sections at various points in time. The aim of this meta-review of 14 hospital evaluations is to highlight lessons learned and identify some of the major themes, which emerge for discussion.

Isabelle Voiret
18/01/2013

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012

L’analyse montre un équilibre encore fragile pour divers volets des projets (RH, qualité/standards souhaités, intégration éventuelle, etc …avant d’envisager des scénarios « à terme » avec le Min. Santé. Une vision à distance est nécessaire, avec des étapes à préciser.

FPENFEUNTEUN
24/01/2012