Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com. Alternatively, if you are interested in receiving a copy of an evaluation report, please contact us

In 2010 the operational prospects for OCB (strategic operational plan) outlined the broad objectives for the coming three years and placed renewed attention on key medical areas including surgery and emergency and acute medicine, bringing about increased investment in two hospital programs where OCB focussed on providing emergency surgical care in third level facilities in Tabarre and Kunduz.

This publication was produced at the request of MSF OCB, under the management of the SEU. It was prepared independently by Juan Luis Dominguez and Jon Gunnarsson.
29/10/2015

Following the earthquake in 2010 and the emergency response that ensued, MSF-OCG took the decision to invest in a hospital in the Leogane area that was for several years the biggest hospital managed by MSF-OCG. Given that for the last three years this was the only MSF-OCG project in the country, that the capital is located only two hours from the hospital and that there is a strategic ambition within MSF-OCG to review mission set-ups, OCG and the field teams determined that 2013 was an opportune time to review the Haiti mission.

Annie Desilets
01/11/2014

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012