Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Topic

Country/Region

Zahedan Project for Afghan refugees in Iran : 1st a necessary historical review; and an analysis of the political and technical relevance of the project (10 years). MSF could have proposed earlier health activities directly oriented for local Iraniens. The adequacy of means related to project objectives is considered satisfactory.

Tommaso Fabbri & Vincent Brown
01/04/2011

Towards the end of 2006/ early 2007, MSF-OCB opened a primary health care project in Chhattisgarh, India, part of the Red Corridor within which a low-intensity conflict is taking place between Maoists and Government. The situation remains volatile with potential for the project to remain operational for some years. Within this context, and given no history of previous evaluations, a decision was taken to assess the relevance and impact of the project, as well as the appropriateness of operational strategies in relation to these, including the potential for phase out.

Iesha Singh, Anneli Eriksson and Alexandra Papis
25/01/2011

MSF Operational Centre Barcelona Athens (OCBA) conducted an evaluation of MSF’s withdrawal from Liberia and the transfer of the Benson Hospital – managed since 2005 by MSF OCBA - to the Ministry of Health. The aim is to gain knowledge through this handover process. The preceding evaluation on the Benson Hospital project, carried out in August 2008 (S. Delaunay; S Girvin) recognised that, for MSF OCBA, deciding on the most appropriate withdrawal process would be a challenge.

Géraldine Brun
13/07/2010

The hand over of MSF-F Phnom Penh HIV project is a complex process. This HIV cohort is the biggest of MSF OCP to be handed over so far and the hand over is almost directly done to the national health authorities, NGO partners having been identified only for minor parts of the project. In the first part of the report, a narrative description and an evaluation of the main technical aspects of the handover process are presented.

Cristina Orlandini
01/04/2010

 

French report. MSF launched a project in Mali in September 2007 to treat Vesicovaginal fistula (VVF) which continued until January 2008. This cost analysis study was conducted in response to concerns about the high costs of the surgical procedure.

Please note: this report is not available online. Please email Evaluations.Sweden@lakareutangranser.se to request access.
 

Guillaume Jouquet
02/04/2009

This evaluation was requested by MSF CH Geneva and focuses on the pertinence, efficacy and impact of the sexual violence project in Guatemala. The motivation to evaluate this program stemmed from difficulties at the initial stages of the project in realizing the goals through the original strategies chosen. The results answer key questions about the added value of the intervention regarding the problem of the sexual violence (SV).

María Luisa Cabrera Pérez-Armiñan and Marilyn McHarg
10/03/2009

Médecins Sans Frontières has been running HIV/AIDS treatment programmes since 2001. As national systems scaled up capacity, MSF began to hand over HIV projects in 2005. Variable experience with handover and internal debates about MSF responsibility to patients led OCG to propose an evaluation of the handover process, to learn from experience and inform policy and practice. A qualitative review was carried out through interviews, case studies in Cameroon and Laos, and review of other vertical and integrated HIV projects.

Dr. Rosamund Lewis and Dr. PehrOlov Pehrson
01/01/2009

The primary purpose of this evaluation was to help the field and HQ staff of MSF make informed decisions on the future of the Benson Hospital project, particularly the focus of future activities and a potential time frame for the handover of the services currently provided by MSF to other actors in Liberia.

Sophie Delaunay and Sally Girvin
01/08/2008

Internal report An Ebola outbreak was declared in Uganda on 29th of November 2007. An MSF Intervention took place between 1st of December 2007 and 18th January 2008. This report summarises, after general issues, the main points on intersection coordination, coordination with other/external actors, human resources management, expat health and project set up.

admin
09/06/2008

Pages