Photos: 

Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

A series of failures was the starting point for this analysis. Several outbreaks of hepatitis E, transmitted via the water supply, occurred in refugee and IDP sites in the Sahel (Sudan in 2004, and Chad in 2007) and in central Africa (Central African Republic in 2002, and Uganda in 2007). MSF was responsible for all or part of the water supply, as well as medical care. These outbreaks are a reminder that significant infectious risks persists even after we implement our usual procedures.

Jean-Hervé Bradol, Francisco Diaz, Jérôme Léglise, Marc Le Pape
08/07/2015

This is the internal reflection report for OCAs Ebola intervention in Sierra Leone. While there are numerous workshops and reflections being organized across theMSF movement, and this OCA report may form part of the larger process, its primary function willreflect on how we as OCA responded, what we learnt, and what we need to do for possible futureepidemics. The report covers discussions around Operational Decision Making, HQ setup and field supprt, Biosafety, Cinical care in EMCs and Duty of care to our international staff.

Vicky Treacy-Wong
01/06/2015

In the last decade, while facing increasingly complex “projects”, MSF-OCP has chosen to add means to improve its interventions. This results in the actual growth syndrome of MSF-OCP HQ departments, which is also significantly impacting country coordination (CC) set-ups and means. New scenarios should be tested, notably for mono-projects (to revise), the idea being to reduce CC set-ups whenever possible. Resources' analyses highlight the importance of competent persons to follow (coordinators & key positions), including PCs, with a clearer career path.

Marie‐Laure Le Coconnier
01/08/2013

This evaluation aimed at gaining perspective on and learning from current partnership practices, informing the debate on MSF’s policy on partnerships and providing guidance for future engagement. Four separate field evaluations in DRC, Kenya, Niger and North Korea as well as a desk review of seven additional partnerships have been conducted. The report provides good practice examples and practical recommendations.

Karima Hammadi and Annie Désilets
01/02/2012

L’analyse montre un équilibre encore fragile pour divers volets des projets (RH, qualité/standards souhaités, intégration éventuelle, etc …avant d’envisager des scénarios « à terme » avec le Min. Santé. Une vision à distance est nécessaire, avec des étapes à préciser.

FPENFEUNTEUN
24/01/2012

In CAR, MSF’s medical presence finds itself unprecedentedly in the midst of a health desert. MSF intervenes in CAR to provide access to health to populations affected by the conflict in the North. Within this context, 3 MSF sections (MSF-OCBA, OCA, OCP) in CAR since 2006 requested an evaluation of their hospital-based projects. This work involves the comparison of the three projects (hospital + outreach activities) and the analysis of factors in the face of a potential handover to the MoH or other actors present in the area.

Isabelle Voiret and Vincent Brown
20/12/2011

The analysis shows a still fragile equilibrium for several components of these projects: HR, Quality Standards expected, possibilities of integration in RCA etc. Before imagining handover scenarios with the MOH and/or others actors, MSF needs to take a longer term view and define carefully the steps.

Isabelle Voiret, Vincent Brown
01/12/2011

Pages