Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com. Alternatively, if you are interested in receiving a copy of an evaluation report, please contact us

OCG intervened after 5 natural disaster events in 2007, spending a total amount of 1.589.064 CHF. An additional two assessments were conducted without intervention. This evaluation was initiated in order to provide facts for a revision of the OCG policy towards response to natural disaster and the strategies applied in such a response.

Benoit Porte
01/06/2008

2005 was marked by two major natural calamities, the tsunami waves in South East Asia and the earthquake in Kashmir, Pakistan. Both of them were followed by a large intervention of MSF. After the initial assessment, MSF Belgium concentrated his efforts on the district of Bagh. The report will focus on the first 3 months of the intervention. As only a few documents are available, it was requested to reconstitute a chronology of intervention. Secondly, when there was time available, a short description and appreciation of the interventions of the other MSF sections was asked.

William Claus
01/04/2006

This operational evaluation, requested by the Emergency Department of MSFOCB, concerns only the emergency response in Aceh in the first three months (from 26th Dec 2004). The report illustrates MSF intervention strategy, a description of implemented activities and draws lessons learned from the confronted challenges.

01/11/2005

This evaluation concerns the Natural Disaster Emergency Preparedness & Response Programme (NDPrep) executed by MSF-H in Bangladesh and the resulting interventions related to the floods in the period July - November 1998. A field visit to Bangladesh was made from 30 November - 10 December.

Contents

Van de Putte, B.
01/04/1999

Pages