Some evaluation reports are public and can be downloaded from this website, while others are restricted to MSF users and can only be accessed via Tukul. This limitation is mainly due to the sensitive nature of the operational contexts and the resulting content. However, there are internal discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Topic

Country/Region

This evaluation takes stock of the two and a half year handover process that started in June 2011. The evaluation highlights both the operational strengths and weaknesses and identifies areas for improvement. The work aims to inform the replicability of the handover tools and approach. The evaluation finds that, at patient level, there has been no impact on the continuity of care and that gives a good indication of a sustainable and smooth take over by MoH.

Helene Juillard
01/12/2013

This evaluation contributes to the debate around the OCB Martissant intervention following the proposed closure and resulting decision to scale down in 2013. The report concludes that the context remains similar to that of the beginning therefore the intervention is still as relevant as it was in 2006 however the evaluation questions the suitability of OCB's country wide strategy in Haiti, urging a focus towards the most vulnerable and marginalised urban populations, rather than towards the general needs of the population.

Stockholm Evaluation Unit
01/10/2013

This evaluation contributes to the debate around the OCB Martissant intervention following the proposed closure and resulting decision to scale down in 2013. The report concludes that the context remains similar to that of the beginning therefore the intervention is still as relevant as it was in 2006 however the evaluation questions the suitability of OCB's country wide strategy in Haiti, urging a focus towards the most vulnerable and marginalised urban populations, rather than towards the general needs of the population.

Stockholm Evaluation Unit
23/09/2013

In the last decade, while facing increasingly complex “projects”, MSF-OCP has chosen to add means to improve its interventions. This results in the actual growth syndrome of MSF-OCP HQ departments, which is also significantly impacting country coordination (CC) set-ups and means. New scenarios should be tested, notably for mono-projects (to revise), the idea being to reduce CC set-ups whenever possible. Resources' analyses highlight the importance of competent persons to follow (coordinators & key positions), including PCs, with a clearer career path.

Marie‐Laure Le Coconnier
01/08/2013

Best practices, challenges and lessons learned from the HIV/AIDS programme in Tsholotsho, with main purpose to improve project implementation amd decision making in future projects.

Eleonora Aralla and Johan de Smedt
01/04/2013

This report summarises the key lessons learned from MSF's cholera interventions in Zambia 2004, 2006, 2008, 2010 (OCBA), Guinea Bissau 2005-2008 (OCBA), Juba 2006 (OCBA), Haiti 2010-2011 (OCBA), Angola 2006 (OCB, OCA, OCBA), Zimbabwe 2009 (OCB, OCA, OCBA)

M Iscla
09/05/2012

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012

- L’évaluation technique demandée par les ROL (Resp Opés Log) de 5 OCs MSF a permis de capitaliser sur une liste de produits pertinents/construction de la conception à la réalisation. Les projets MSF ont tous abouti (ça marche !), mais un Comité de Projet permanent doit garantir le suivi de projets aussi ambitieux. - La réalisation en urgence pour certains (6 à 8 mois) doit être modulée en fonction des exigences de qualité, projet à moyen terme (3 à 5 ans). - L’utilisation de conteneurs est pertinente en post-séisme, mais la durabilité des matériaux reste un facteur à prendre en compte.

FPENFEUNTEUN
02/02/2012