Photos: 

Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

C

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012

La stratégie MSF de développer en 6 ans (90  265 lits) les activités d’un vaste complexe hospitalier en brousse (zone de conflit) est revue. Tenant compte des activités actuelles MSF/M.Santé, l’intégration difficile dans la carte sanitaire est analysée, avec propositions. Les résultats contribuent à la réflexion en cours sur les hôpitaux long terme à MSF.

Isabelle Voiret & Vincent Brown
01/10/2011