Photos: 

Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

C

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012

In the beginning of 2006, OCB opened a hospital project in Bor, in Jonglei state, South Sudan. This was a little over a year after the CPA (the Comprehensive Peace Agreement) was signed between SPLA and GoS The project soon became one of the highest resources consuming project in an unstable environment. In mid 2008 the decision was taken to close the project. OCB considered that they were unable to manage the hospital. It was not thought that the project in the current format was sustainable security wise, given a number of factors.

Anneli Eriksson
14/01/2010