Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Country/Region

C

This survey investigates patients’ coping mechanisms and their dependence on medical institutions both from the patients’ standpoint and from that of MSF’s project teams.

Marc Le Pape and Suzanne Bradol
08/07/2015

Through an analysis of the events that have marked MSF’s history since 2003, this series of case studies and historical accounts describes the evolution of MSF's humanitarian ambitions, the resistance to these ambitions and the political arrangements that overcame this resistance (or that failed to do so).

edited by Claire Magone, Michaël Neuman, Fabrice Weissman
22/11/2011

The evaluation looks at the process for managing MSF-OCP's construction/rehabilitation projects since 2012. The main problems identified are not related to the process itself, but the way it is put into application. The main users pointed out the long delays (periods of indicision) as being the biggest difficulty, followed by budget/cost issues (cost/m² estimates) , and the quality of constructions (techniques, materials, etc). One of the root causes of delays relates to unclear/incomplete definition of roles and responsibilities = actions to take.

Nicolas Bérubé & Vincent Brown
16/07/2015

Towards the end of 2006/ early 2007, MSF-OCB opened a primary health care project in Chhattisgarh, India, part of the Red Corridor within which a low-intensity conflict is taking place between Maoists and Government. The situation remains volatile with potential for the project to remain operational for some years. Within this context, and given no history of previous evaluations, a decision was taken to assess the relevance and impact of the project, as well as the appropriateness of operational strategies in relation to these, including the potential for phase out.

Iesha Singh, Anneli Eriksson and Alexandra Papis
25/01/2011

 

French report. MSF launched a project in Mali in September 2007 to treat Vesicovaginal fistula (VVF) which continued until January 2008. This cost analysis study was conducted in response to concerns about the high costs of the surgical procedure.

Please note: this report is not available online. Please email Evaluations.Sweden@lakareutangranser.se to request access.
 

Guillaume Jouquet
02/04/2009

RIDER, CRASH and Epicentre have finalized a critical review of the operations of MSF France in Borno, Nigeria, from 2015 to 2016.

***English and French version available***

This publication was produced by RIDER, CRASH and Epicentre.
01/03/2019

The objective of this lessons learnt exercise was to assess the advantages and disadvantages of the UNITAID grant governance and management model for project achievements in terms of medical (and related) outcomes, strategic decisions, the potential for collaboration between multiple MSF entities and to leverage the learnings for replication in future projects. The exercise showed that the project directly delivered a new, more effective, simpler and much cheaper treatment to patients across seven countries.

This publication was produced at the request of MSF OCG, under the management of the Vienna Evaluation Unit. It was prepared independently by Hugues Juillerat, Sharon McClenaghan and Glenn O’Neil of TRAASS International.
15/01/2019

This document describes the project Lessons identified at the end of the market entry planning phase for MSF in Finland. It summarises the successes and challenges encountered during the project, lists the learning themes arising from these successes and challenges, and includes a set of lessons derived from an analysis of these learning points. The Annex contains a proposed (brief) framework with criteria and pre-requisites for a successful Market Entry Plan in MSF based on this experience. NOTE: This is not an evaluation and therefore there is no ambition for independent judgement.

This Retrospect was facilitated by the Stockholm Evaluation Unit on behalf of the Project Team. The report has been prepared by Timothy McCann.
30/10/2017