Evaluation reports are either openly accessible via pdf download, or accessible via MSF's internal Sharepoint, which is mainly due to the sensitive nature of the operational contexts and resulting content. However, there are ongoing discussions about making all evaluation reports publicly searchable. If you are an MSF association member, reports are made available on various associate platforms such as www.insideOCB.com.

Topic

This evaluation was commissioned by MSF-OCBA with the aim to analyse the experience of the project in Shangil Tobaya/Sudan in order to learn lessons for other remote programmes in MSF. The Shangil Tobaya project demonstrates that MSF can achieve its operational goals even through remote programming if the modus operandi is adapted. This requires skilled human resources, appropriate supplies and good knowledge of the context and counterparts.

Mzia Turashvili and Jean-Marc Biquet
21/05/2012

This evaluation report is part of the overall report "Enriched or Confined? MSF-Engagement in Local Partnerships".

Karima Hammadi
06/03/2012

This evaluation report is part of the overall report "Enriched or Confined? MSF-Engagement in Local Partnerships".

Annie Désilets
06/03/2012

This evaluation report is part of the overall report "Enriched or Confined? MSF-Engagement in Local Partnerships".

Karima Hammadi
05/03/2012

This paper analyses partnership relationships between NGOs and donors. Using a framework adapted from Dahl (1957) to explore issues of power in the relationships of a US-based development NGO, it questions whether the current emphasis on organisational partnership is useful or whether, in practice and in theory, greaterrecognition should be given to the importance of relationships between individuals.
It examines whether asymmetrical relationships can be termed partnerships and highlights the potential for such a discourse to reinforce existing power inequalities.

Sarah Lister
01/03/2012

After the 12 January 2010 earthquake in Port-au-Prince, 4 MSF sections (OCG, OCA, OCP and OCB) decided to build container hospitals to respond to the health care needs (including Léogâne). All of these prefabricated structures, though varying in quality, were unique in that they were partially or completely built from modular containers (with different architectural designs). Construction was done by subcontractors, MSF teams trained in construction, or a combination of the two.

Monique Lathelize, Marie-Laure Le Coconnier, Julien Bégou
02/02/2012

- L’évaluation technique demandée par les ROL (Resp Opés Log) de 5 OCs MSF a permis de capitaliser sur une liste de produits pertinents/construction de la conception à la réalisation. Les projets MSF ont tous abouti (ça marche !), mais un Comité de Projet permanent doit garantir le suivi de projets aussi ambitieux. - La réalisation en urgence pour certains (6 à 8 mois) doit être modulée en fonction des exigences de qualité, projet à moyen terme (3 à 5 ans). - L’utilisation de conteneurs est pertinente en post-séisme, mais la durabilité des matériaux reste un facteur à prendre en compte.

FPENFEUNTEUN
02/02/2012

This evaluation aimed at gaining perspective on and learning from current partnership practices, informing the debate on MSF’s policy on partnerships and providing guidance for future engagement. Four separate field evaluations in DRC, Kenya, Niger and North Korea as well as a desk review of seven additional partnerships have been conducted. The report provides good practice examples and practical recommendations.

Karima Hammadi and Annie Désilets
01/02/2012
FPENFEUNTEUN
24/01/2012

L’analyse montre un équilibre encore fragile pour divers volets des projets (RH, qualité/standards souhaités, intégration éventuelle, etc …avant d’envisager des scénarios « à terme » avec le Min. Santé. Une vision à distance est nécessaire, avec des étapes à préciser.